Qolsys IQ Panel 2 Installation Guide — Software Version 2.5.0

This guide provides installation details for the Qolsys IQ Panel 2 when running software version 2.5.0. Always follow manufacturer recommendations for wiring, mounting, and network setup.

Requirements

  • Qolsys IQ Panel 2 with software version 2.5.0 installed.
  • Stable power source and backup battery.
  • Active Wi-Fi and/or cellular connectivity for setup.
  • Installer or dealer access credentials.

Installation Steps

  1. Unbox the panel and confirm all components are included.
  2. Mount the panel securely on a wall near a power outlet and Wi-Fi signal.
  3. Connect to power and allow the panel to boot.
  4. On-screen prompts guide you through:
    • Wi-Fi setup
    • Sensor enrollment
    • User code setup
    • System configuration
  5. Verify panel connectivity to Alarm.com.
  6. Run a communication test to ensure monitoring is active.

Tips & Notes

  • All IQ Panel 2 and IQ Panel 2 Plus models use the same installation procedures.
  • For PowerG devices, ensure proper antenna orientation during setup.
  • Firmware updates may add new features—always check the panel’s current version after installation.